1.The whole line process including fold U, multi-point automatic welding, seam welding
2. The seam welding process can realize the automatic switching of parameters of straight edge and corner position
3. Positioning tooling can realize XY direction adjustment
4. The conductive part is specially designed with automatic tensioning mechanism
Servo XZ-axis transposition/medium frequency welding machine independent between work sequences/compatible with both 46L and 68L workpieces.
Sequence: Pre-spot welding of top and bottom center plate - Single-head seam welding of top and bottom center plate - Double-head seam welding of top and bottom center plate - Pre-spot welding of front plate - Long-edge seam welding of front plate - Short-edge seam welding of front plate
Tempo: 35S
The production process of Heron Intelligent Equipment news & events is supported by advanced technology.
The Heron Intelligent Equipment bench spot/press welders is analyzed in depth in the original design.
Contact Person: Christina Liu
Tel: 86 20 87813325 / 86 20 87819588 / 86 20 87815075
Fax: 86 20 87813346
Address: No.63 Xin Yi Road, Guangzhou, Guangdong China 510990